![]() |
A contractor is drilling the holes for the new steel way-beam bearers.
Photo:J.B.Pepper |
![]() |
The holes are drilled using a Mag-stand drill to ensure accurate alignment.
Photo:J.B.Pepper |
![]() |
It's slow going and the drill needs plenty of lubrication.
Photo:J.B.Pepper |
![]() |
The new timbers are carried to site on the bogie bolster wagon. It's nice to see a vehicle being used for the job it was originally designed for.
Photo:J.B.Pepper |
Copyright © Northampton & Lamport Railway 1996-2006