|
|
The new wing wall for the north end of Bridge 13 is rebuilt using modern materials.
Photo:P.A.Entwistle |
|
|
The new wing wall sits on solid footings and is tied to the existing brickwork.
Photo:J.B.Pepper |
![]() |
The finished wall is faced and capped with original bricks to maintain the appearance of the bridge. The void behind will be filled with concrete.
Photo:J.B.Pepper |
Copyright © Northampton & Lamport Railway 1996-2006