![]() |
Westminster arrives by low-loader from East Tisted on 27th October 1998.
Photo: J.B.Pepper |
![]() |
Work to strip Westminster began with the removal of the roof and front section of the cab.
Photo: J.B.Pepper |
![]() |
With the cab removed work turned to the smoke-box end of the locomotive.
Photo: J.B.Pepper |
Copyright © Northampton & Lamport Railway 1996-2006